а√天堂中文在线资源bt种子,菠萝蜜视频app,亚洲精品日韩一区二区电影,蜜臀AV人妻久久无码精品麻豆

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
大地资源免费第二页| 少妇放荡的呻吟干柴烈火免费视频| 曰本女人与公拘交酡视频| 公交车上拨开少妇内裤进入| 欧美变态另类刺激| 最新无码网站在线观看| 人妻少妇一区二区三区| 成人免费看aa片| 四虎影视在线观看2413| 久久国产精久久精产国| 国产成人精品免费青青草原| 成人午夜视频| 吃奶摸下的激烈免费视频| 久久精品久久精品中文字幕| 精品无码国产污污污免费| 亚洲最大的熟女水蜜桃AV网站| 无码无套少妇毛多18pxxxx| 夜夜高潮夜夜爽高清完整版1| 日本a∨精品一区二区三区| 999久久久国产精品消防器材| 欧美亚洲国产日韩一区二区| 香港台湾经典三级a视频 | 99热这里全部都是精品| 亚洲高清乱码午夜电影网| 免费久久精品国产片| 免费a片看黄网站www| 欧美同性猛男gay69| 刺激性视频黄页| 美女穿旗袍丝袜流白浆视频 | 最近更新2019中文字幕7| 无区码一码二码三码| 国产精品无码av天天爽播放器| 欧美色播| 国产AV无码| 日本久久99成人网站| 无码AV高潮抽搐流白浆在线| 国产av精国产传媒| 乱码国产丰满人妻www| 亚洲av中文无码乱人伦在线咪咕| 按摩技师玩弄少妇到高潮| 性色AⅤ一区二区三区天美传媒|