а√天堂中文在线资源bt种子,菠萝蜜视频app,亚洲精品日韩一区二区电影,蜜臀AV人妻久久无码精品麻豆

AC source power & DC source power manufacturing factory

Test Application on AC Contactor

AC contactor is a switching device which uses electromagnetic force and spring elastic force to connect and break contacts to control the on-off of load circuit. It is suitable for frequent operation and long-distance control. It is an important component of automatic control circuit system. With the growth of national economic demand and power industry, the demand for AC contactors continues to grow, and competition is increasingly fierce. In order to ensure product quality, the testing of AC contactors is particularly important.

Following will take AC contactor test requirements as an example to introduce AC contactor test scheme in detail.
Before starting the test, we first understand its working principle: when the AC contactor's attraction coil is electrified, the static iron core produces electromagnetic attraction, the armature is absorbed, and the connecting rod connected with the armature drives the contact action, so that the normally closed contacts are disconnected, and the often open contacts are closed, both of them are linked, and the contactor is in the electrified state; When the coil is cut off, the electromagnetic suction disappears, the armature is released under the action of spring, which makes the normally closed contacts closed, the often open contacts disconnected, and the contactor is in a state of power loss.

The client test requirements are as follows: 

1. ON/OFF test: Set ON/OFF AC voltage (rated voltage), starting angle 90 degrees, termination angle 0 degrees, ON/OFF twice, and finally OFF.            
2. Characteristic test: setting voltage (rated voltage), starting angle 30 and termination angle 90 and output ON. Read peak current immediately, delay 500 ms, read and maintain current, maintain power consumption, and finally OFF.           
3. Suction voltage test: first set the suction start voltage (20% of rated voltage), output to ON, then every 200 ms, the voltage rises in accordance with 5V step up to suction, read the suction voltage, and finally output OFF.            
4. Release Voltage Test: First set the release starting voltage (rated voltage), output to ON, set the release voltage (rated voltage 68%) and then every 200 ms, the voltage descends according to 5V step to read the release voltage after release; finally output the OFF.

Among them:
Test requirements 1,2, can be achieved by the panel setting function of ADMIRE POWER standard AC power supply APA1000 series . This function can be set voltage, frequency, starting phase angle and terminating phase angle. The range of setting phase angle is 0-360.

Test requirements 3,4, can be achieved through the ADMIRE POWER standard AC power APA1000 series power supply internal test group, the function can be set up 35 test points to set the starting voltage value, termination voltage value, step voltage value, start frequency, termination frequency and single step time, so that the power supply voltage and time Frequency varies in a step-by-step fashion. If the 35 test points are not enough, the intelligent AC power supply APA2000 series (touch screen display) can provide five test groups, each of which has 35 test points, and each test point can set different voltage, frequency and time.

Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
婷婷丁香五月六月综合激情啪| 午夜在线不卡精品国产| 国产成人A在线视频免费| 99久久精品国产自在首页| 男人把女人桶到喷白浆的软件免费 | 亚洲丰满熟女一区二区蜜桃 | 欧美另类 自拍 亚洲 图区| 少妇wwwb搡bbb搡bbb| 亚洲色无码中文字幕| 亚洲精品自在在线观看| 免费又黄又爽1000禁片| 女人和拘做受全过程免费| 亚洲丰满熟女一区二区蜜桃| 一个人看的www片免费高清视频| 久久双人床双人片| 九九九国产精品成人免费视频| 顶级欧美做受xxx000| 国产电影无码午夜在线播放| 日本乱妇乱子视频| 亚洲aⅤ日韩av电影在线观看| 国产精品久久久久久久久绿色| 久久成人成狠狠爱综合网| 久久久久无码中| 性久久久久久| 国产成人高清亚洲明星一区| 亚洲国产综合精品中久| 我和饥渴的老熟妇| 极品成人影院| 精品无码国产污污污免费网站国产| 成人免费看aa片| 成人女人a级毛片免费软件| 婷婷久久综合九色综合绿巨人| 最近新韩国免费| 娇妻被黑人粗大高潮白浆| 另类zozozozozo交| jzzijzzij亚洲成熟少妇 | 四川少妇bbw搡bbbb槡bbbb| 我和亲妺妺乱的性视频| 青青草原中文字幕mv| 正在播放强揉爆乳女教师| 久久久久久久无码高潮|